What are the gates in the stage-gate process?

The traditional Stage-Gate Process or Phase Gate Process has five basic steps after the discovery or the ideation process is completed. These include scoping, building a business case, development, testing, and validation, followed by launch.

What is stage-gate process in product development?

The Stage Gate Process, also known as the Phase Gate Process, guides the product development process through six main phases. The stages in the Stage-Gate are Discover, Scoping, Define Business Case, Development, Testing and Validation and Launch.

What is Gate 2 in project management?

Gate 2 is the third gate in the 4D change project framework. Passing Gate 2 accepts completion of the Definition phase and allows the project into the Discovery phase, approving necessary resources for this work.

What are project stage gates?

The phase gate process is a technique that is used to guide a project from conception to launch. It requires a review of each project stage before moving on to the next. In the phase gate review process, specific criteria must be met to determine the success of a phase and the ongoing viability of a project.

What are project Gates?

Project Gates are key points in a project where a formal review of the project’s current state is performed. Most often they appear at the phase transitions of projects and represent a point in the project where the sponsor and stakeholders will incur increased risk, expense, and reward.

What is the purpose of a stage gate process?

The Stage-Gate model is designed to improve the speed and quality of execution of product innovation activities. The process helps project teams prepare the right information, with the right level of detail, at the right gate to support the best decision possible.

What is Gate 3 project management?

For example, Gate 3 might be a “Design Gate” meaning that the project design phase will follow the Gate. This Gate would examine the efforts and products completed to-date to determine if the project should proceed into design, and make the investment.

What is a Gate 5 review?

A post implementation review is an internal project assurance for the project owner to confirm that the investment in the business case was justified and lessons learned have been captured. The Gate 5 review is an external peer review that includes the post implementation review as a major input into its investigation.

What is stage gate analysis?

Stage gate analysis is a method of reviewing a finished project and summarizing it, whereas conventional stage gate management is used to control an on-going project.

What is a gate 6 review?

Gate Six. Gate Six: Gate Six review assesses overall program health including readiness for production, the sufficiency of the SDS, the Earned Value Management System (EVMS), Program Management Baseline (PMB), and the Integrated Baseline Review (IBR).