What are two ways that spent fuel can be stored?

There are two storage methods used for spent fuel: spent fuel pools and dry cask storage.

How do you deal with spent nuclear fuel?

Used nuclear fuel can be recycled to make new fuel and byproducts. More than 90% of its potential energy still remains in the fuel, even after five years of operation in a reactor. The United States does not currently recycle used nuclear fuel but foreign countries, such as France, do.

What are the advantages to reprocessing spent fuel?

For those concerned about the large amount of spent fuel produced by nuclear reactors, reprocessing is also an effective way to significantly reduce the amount of waste to be disposed. After reprocessing, only about three percent of the original quantity of nuclear material remains unusable, high-level waste.

How does France reprocess nuclear waste?

Upon its removal from French reactors, used fuel is packed in containers and safely shipped via train and road to a facility in La Hague. There, the energy producing uranium and plutonium are removed and separated from the other waste and made into new fuel that can be used again.

What is done with spent fuel once it is removed from the reactor?

Spent fuel that has been removed from a reactor is ordinarily stored in a water-filled spent fuel pool for a year or more (in some sites 10 to 20 years) in order to cool it and provide shielding from its radioactivity.

What are PWRs and BWRs?

Pressurized water reactors (PWRs) and boiling water reactors (BWRs) are classified as light water reactors (LWRs). In the United States LWRs are used in the production of electric power. As of 2016, 69 out of 104 commercial nuclear power plants licensed by the U.S Nuclear Regulatory Commission are PWR’s. [ 1,2]

What is spent fuel management?

Spent fuel is the name given to nuclear fuel that has been removed from a nuclear power or research reactor following irradiation. It is a mixture of plutonium, uranium and waste materials and is no longer usable as fuel.

What is the purpose of nuclear fuel reprocessing?

Over the last 50 years or so the principal reason for reprocessing used fuel has been to recover unused plutonium, along with less immediately useful unused uranium, in the used fuel elements and thereby close the fuel cycle, gaining some 25-30% more energy from the original uranium in the process.

How many times can you reprocess nuclear fuel?

It can employ all the actinides, closing the nuclear fuel cycle and potentially multiplying the energy extracted from natural uranium by about 60 times….Separated components and disposition.

material disposition
long-lived fission and activation products nuclear transmutation or geological repository

How does Russia dispose of nuclear waste?

The Russian navy has traditionally dealt with virtually all of its radioactive wastes by disposal to sea. Many areas of the Barents, Kola and the Sea of Japan are heavily contaminated.

How does Finland dispose of nuclear waste?

Finland is building a nuclear waste disposal site deep under the tiny city of Eurajoki. Called Onkalo, meaning “deep pit” in Finnish, the nuclear waste repository is slated to open in 2024. If all goes to plan, copper casks will safely store spent uranium fuel rods for at least the next 100,000 years.

What are the methods of disposal of radioactive waste?

Disposal of low-level waste is straightforward and can be undertaken safely almost anywhere. Storage of used fuel is normally under water for at least five years and then often in dry storage. Deep geological disposal is widely agreed to be the best solution for final disposal of the most radioactive waste produced.