What is timer boundary event?
What is timer boundary event?
Timer boundary event When an execution arrives at the activity where the boundary event is attached, a timer starts. When the timer fires (for example, after a specified interval), the activity is interrupted and the outgoing sequence flow of the boundary event is followed.
What is boundary event in camunda?
Boundary events A boundary event must be an intermediate catch event, and can be either interrupting or non-interrupting. Interrupting means that once triggered, before taking any outgoing sequence flow, the activity the event is attached to is terminated.
What is boundary event?
Boundary Events are events that sit attached to to an activity’s boundary. These events can have triggers configured to them and can start alternative or additional paths in a process app. Boundary Events can be added to any activity such as Tasks, Call Activities or Sub Processes.
What can be used as a boundary event?
A Boundary Event is an Intermediate event which can be placed on the boundary of any of the following activities:
- SubProcess, Task, or Call Activity.
- SubChoreography, Choreography Task, or Call Choreography.
What is a boundary event in risk management?
“An Insurance Risk /Operational Risk boundary event is an operational risk event that triggers an insurance risk consequence (e.g. a financial loss).”
What is boundary risk?
In terms of the Risk Landscape, Boundary Risk is exactly as it says: a boundary, wall or other kind of obstacle in your way to making a move you want to make. This changes the nature of the Risk Landscape, and introduces a maze-like component to it.
What is a credit boundary event?
Credit Boundary Events: Losses that are related to both operational risk and credit risk. For example, where a loan defaults (credit risk) and the bank discovers that the collateral for the loan was not properly secured (operational risk).