What are the three most important signs that should appear on a commercial construction site?

They are:

  • Danger signs – Where there’s a major hazard, this type of sign needs to be in front of it to alert workers and visitors.
  • Warning signs – If a serious injury or death can happen, a warning sign is needed.
  • Caution signs – If minor or major injuries can happen, a caution sign is a good thought.

Where are signages needed?

Safety signs will need to be posted in hazardous areas, around dangerous machinery, by emergency evacuation routes, on pipes, and many other areas around the workplace. A facility or safety manager should assess their workplace and identify hazardous areas with a job hazard analysis.

What must be displayed on a construction site?

Information that must be displayed on a construction site: Health and Safety law poster. Insurance certificates. Fire and emergency plan.

What signs are required on a building site?

You will need signs for defined fire escape routes, fire points, first aid, medical evacuation plans, confined space identification and procedures along with a full range of specific hazard signage pertaining to each area and phase of the site.

What colour are mandatory signs?

BLUE
Health and Safety (Safety Signs and Signals Regulations) 1996

Type Shape Colour
WARNING SIGNS These signs give warning of potential risks Triangular YELLOW with black symbol or text
MANDATORY SIGNS Signs that require actions or activities that will contribute towards safety Circular BLUE with symbol or text in white

Where signage should be placed before any work is started?

When should you display safety signs? Construction safety signage that is suitable for the work being done, must be erected before work starts. Signs must be displayed prominently in appropriate places around the work area to warn – That the area is a construction workplace or area eg: Construction site.

Where does the F10 need to be displayed?

The notice must also be clearly displayed in the construction site office in a comprehensible form where it can be read by any worker engaged in the construction work; and if necessary, be periodically updated. HSE will take 10 days to process notifications by manual form.